Removal of a mineralised bitumen felt roof and replacement with polymethyl methacrylic resin (PMMA) with applied rolls over 50mm of insualtion board to create a 'warm' roof. Installation of new cast iron rainwater pipe and drain connection.
1 The Square Greta Bridge Barnard Castle DL12 9SD
22nd January 2024
Listed building application to retrospectively discharge conditions 3 (roof materials) and 4 (window frames and rooflights) pursuant to permission DM/19/03572/LB and for the installation of a new front door