Recent Planning Applications

East Lodge Greta Bridge Barnard Castle DL12 9SE

13th May 2025

Removal of a mineralised bitumen felt roof and replacement with polymethyl methacrylic resin (PMMA) with applied rolls over 50mm of insualtion board to create a 'warm' roof. Installation of new cast iron rainwater pipe and drain connection.

1 The Square Greta Bridge Barnard Castle DL12 9SD

22nd January 2024

Listed building application to retrospectively discharge conditions 3 (roof materials) and 4 (window frames and rooflights) pursuant to permission DM/19/03572/LB and for the installation of a new front door